Dormac has been hard at work on the Stingray. How hard? The numbers tell the story…. Weight of steel replaced: 8 tonnes. Area of main deck and hull blasted and coated: 9 000m2. Length of hot water system upgraded with Aquatherm piping: 320m. Sea chest inlets modified: 3. Plus we performed a 550 load test on the Leiberr Crane. So what do all those numbers add up to? A big job, with big results! Keep an eye on our Facebook page to find out more about this and other jobs!