Smit Amandla Marine – Smit Energy

Bunker Tanker

Man hours: 51487

May 2008 – 7 Weeks

  • The bottom section of the double hull had been pre-fabricated.
  • Side and flat bottom sections were double hulled.
  • The complete double-hulling involved 200 tonnes of steel.
  • The Smit Energy received 220 tons for her double hull and was the first existing Bunker barge to be double hulled in South Africa.
Tags:  
  • Smit Amandla Marine – Smit Energy