Husab Mines – Namibia

Man hours:

The work completed for Husab Mines in Namibia included the following:

* We completed the erection of 3 acid tanks (28m Diameter x 17m high).

* Fabricated and installed new overflow lids for CCD tanks, LDX2404 a duplex stainless

* Fabricated and installed a 2.7km pipe line for Engen

* Installed and fabricated canopy covers for conveyor electrical panels

* Removed, fabricated and installed CV01 discharge shoots

* Fabricated and installed CV03 and CV04 discharge shoots with liner plates

Husab Mines Namibia

Husab Mines Namibia

husab-2
Tags: