KCA Deutag – Ben Avon (Walvis Bay and Gabon)

Jack-Up Drilling Rig

Man hours: 17500

July 2011 – 12 Weeks

  • Fabricated and fitted 120 ton grillage onto a heavy lift vessel the MV Triumph in Walvis Bay.
  • MV triumph than departed for Port Gentile in Gabon where we mobilised a team of 19 persons and equipment.
  • The Ben Avon was then lifted by the MV Triumph where we performed repairs to the spud cans and leg bracings.
  • Approximately 200 tons of steel work.
Tags:  
  • KCA Deutag – Ben Avon (Walvis Bay and Gabon)